40+
/ Proof of work
Structures that hold because the load path is right.
Structures delivered.
Selected completed structures
Each entry surfaces the material decisions, connection details, and load-path logic that made the structure buildable.
Bring the brief. We'll work out the structure.
Whether the project is at schematic or construction documents, the desk is open. Constraint-led thinking from the first conversation.






